Allow off-airport extraction across terrains; record Workshop 0.0.124
continuous-integration/drone/push Build is passing

This commit is contained in:
2026-10-28 15:19:50 +01:00
parent 95d21b06ff
commit 970dd338f5
33 changed files with 5892 additions and 134 deletions
+8 -5
View File
@@ -1,14 +1,15 @@
# Generated starts and radio camps
Everon chooses a new prison, radio camp, four mortar sites and optional field
Everon chooses a new prison, extraction landing zone, radio camp, four mortar sites and optional field
hospitals/camps at preparation time. The supply cache retains its authored position.
The extraction helicopter uses the validated
Everon airfield pad (4800.953 / 11487.412), with no off-airfield fallback. The server
resolves the prison first, then the radio, before creating any site entities.
Extraction searches the whole island for a clear landing zone without airport
preference. The server resolves the prison first, then extraction and radio,
before creating site entities. The former Everon airfield pad is only an
authored fallback, subject to the same landing and escape-boundary checks.
Joining clients receive the real replicated locations; intel keeps the same
stable destination IDs.
Site authors can use `RandomClear 1` on a prison, radio, mortar, hospital, outpost
Site authors can use `RandomClear 1` on a prison, extraction, radio, mortar, hospital, outpost
or depot definition. `Heading`
sets the authored fallback heading; `RootHeight` offsets a composition above its
surveyed ground (the radio/table composition uses 0.8 m). Runtime placement never
@@ -16,6 +17,8 @@ rewrites the configuration file. Existing definitions default to authored sites.
Placement samples the island bounds and rejects water, obstructed footprints,
terrain varying by more than 0.6 m, nearby roads (12 m), and unsafe guard footing.
Extraction uses the 0.8 m landing-pad limit and permits clear paved ground, with
additional aircraft footprint, overhead clearance and secondary transport checks.
Prisons avoid physical runway/control-tower anchors by 1,500 m. The radio stays
at least 1 km from the prison and 300 m from other sites. The extraction pickup
must remain inside the prison-relative escape boundary with 100 m clearance.